UPSTREAM: sched/fair: Fix effective_load() to consistently use smoothed load

Starting with the following commit:

  fde7d22e01 ("sched/fair: Fix overly small weight for interactive group entities")

calc_tg_weight() doesn't compute the right value as expected by effective_load().

The difference is in the 'correction' term. In order to ensure \Sum
rw_j >= rw_i we cannot use tg->load_avg directly, since that might be
lagging a correction on the current cfs_rq->avg.load_avg value.
Therefore we use tg->load_avg - cfs_rq->tg_load_avg_contrib +
cfs_rq->avg.load_avg.

Now, per the referenced commit, calc_tg_weight() doesn't use
cfs_rq->avg.load_avg, as is later used in @w, but uses
cfs_rq->load.weight instead.

So stop using calc_tg_weight() and do it explicitly.

The effects of this bug are wake_affine() making randomly
poor choices in cgroup-intense workloads.

Change-Id: I1c0058ff674650cf295c8dc3b88a5a3de4bddab0
Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org>
Cc: <stable@vger.kernel.org> # v4.3+
Cc: Linus Torvalds <torvalds@linux-foundation.org>
Cc: Peter Zijlstra <peterz@infradead.org>
Cc: Thomas Gleixner <tglx@linutronix.de>
Fixes: fde7d22e01 ("sched/fair: Fix overly small weight for interactive group entities")
Signed-off-by: Ingo Molnar <mingo@kernel.org>
(cherry picked from commit 7dd4912594daf769a46744848b05bd5bc6d62469)
Signed-off-by: Chris Redpath <chris.redpath@arm.com>
This commit is contained in:
Peter Zijlstra 2016-06-24 15:53:54 +02:00 committed by Andres Oportus
parent 89e4d18a67
commit 640c909c34

View file

@ -830,8 +830,6 @@ void post_init_entity_util_avg(struct sched_entity *se)
attach_entity_cfs_rq(se);
}
static inline unsigned long cfs_rq_runnable_load_avg(struct cfs_rq *cfs_rq);
static inline unsigned long cfs_rq_load_avg(struct cfs_rq *cfs_rq);
#else
void init_entity_runnable_average(struct sched_entity *se)
{